Monday, 7 July 2008
Concrete floor
Concrete floor laid in existing building and extension.
Saturday, 5 July 2008
First floor
First floor joists installed.
Timber is placed into steel work.
Extension footings put down.
Saturday, 28 June 2008
Block work.
South facing wall rebuilt with windows and door holes.
Original barn entrance gets filled in.
Extension footings excavated.
Footings for extension which will be 5m by 5m in size.
Sunday, 22 June 2008
Stock proof fencing erected around back garden.
North facing wall work commences.
Part of the North facing wall being removed. An extension will be built here using original stone from demolished walls. Old plaster is removed from the remaining walls.
Older Posts
Subscribe to:
Posts (Atom)
Court Barn - Somerset Barn Conversion
Court Barn
Blog Archive
▼
2008
(18)
▼
July
(3)
Concrete floor
First floor
Extension footings put down.
►
June
(15)
Block work.
Extension footings excavated.
Stock proof fencing erected around back garden.
North facing wall work commences.
Footings laid for South facing wall to be rebuilt....
The goat is satisfied that we are in compliance wi...
A goat comes to check that work complies with curr...
Wall removed, concrete floor removed.
Demolition of South facing wall, stone cleaned and...
Gables reduced to a safe height.
Tiles removed and kept, roof trusses removed and s...
Lean to removed and site clearance begins.
Interior of barn and lean to before work commenced...
Views of Church to North and farmland to South.
Barn on day of purchase, previously used as garage...